Document List
Title
NRM Asset | Date
Project Number: 1313
The objective of this project is to inform the North Central CMA of geomorphic processes within the region that threaten assets within the 56 priority waterway reaches identified by the North Central River Health Strategy (2005). More specifically, this project aims to:• compile existing geomorphic information to provide a consistent approach across the region to allow comparative assessment between basins• close sediment-related information gaps• determine the level of threat to assets as a result of current and expected future geomorphic processes• identify priorities for management based on the relative level of risks from geomorphic processes to prioritised assets• relate management priorities to the targets set out by the North Central River Health Strategy (2005).
Project Number: 1490
Brochure Incentives for Catchment Works in the Shepparton Irrigation Region including the Campaspe Irrigation District