Document List
Title 
NRM Asset    |   Date    

The strategic action plan has been built on a wide range of previous documents, including strategies, discussion papers and general articles. These sources have been acknowledged in detail through the text and are listed in the references.
Project Number: 1313
The objective of this project is to inform the North Central CMA of geomorphic processes within the region that threaten assets within the 56 priority waterway reaches identified by the North Central River Health Strategy (2005). More specifically, this project aims to:• compile existing geomorphic information to provide a consistent approach across the region to allow comparative assessment between basins• close sediment-related information gaps• determine the level of threat to assets as a result of current and expected future geomorphic processes• identify priorities for management based on the relative level of risks from geomorphic processes to prioritised assets• relate management priorities to the targets set out by the North Central River Health Strategy (2005).
01-04-2009
Water Resources   |  
Project Number: 1490
Brochure Incentives for Catchment Works in the Shepparton Irrigation Region including the Campaspe Irrigation District
The purpose of this plan is to initiate a regional response to climate change by sequesteringcarbon through revegetation and changing land use.
Understanding rural landholder adaptation/responses to climate variability
How resilient are species to a changing climate?
In NRM, we need models that:
Brainstorm impacts of climate change on native vegetation
Workshop Influence Diagrams
<< First Page  < Previous Page [1]   [2]   [3]   [4]   [5]   [6]   [7]   [8]   [9]   [10]   Next Page >   Last Page >>
Social Media
   Facebook    Twitter    RSS Feed 
DisclaimerPrivacy PolicyVacancies Return to normal view Print Friendly Site MapText Size
© Copyright 2012 North Central Catchment Management Authority. Website by Design Experts.